Hello, I am using CESM2.1.3 to make simulation. I have optimized the pelayout to get a relative high speed. This pelayout has proved excellent in many previous runs. After I submit my latest case, it kept high speed for the first day. However, I found the running speed was reduced by half from the second day. I have contacted my HPC staff to detect potential system problem. I also made some short runs to reproduce this problem and I found the CPL COMM TIME is much longer than before. Is there any hint for solving this?