Thanks so much for your help!Considering your system here: Systems & Equipment | High Performance Computing
The Mellanox EDR (100Gbps) switch is fine. You currently have Intel skylake nodes on the system,
increasing the number of skylake nodes is an option, Following the intel roadmap to a newer technology may also be an option. Most recently AMD nodes are outperforming Intel in price/performance however it is probably not possible for you to consider adding AMD to your cluster. For cesm2 ne120 core (0.25 degrees) we are getting up to nearly 10 ypd on the TACC frontera system (Cascade lake) using up to 45K cores.
How many cores are needed to run at 10 ypd? 45,000 cores seems out of the range of possibilities. Did you mean 4,500 cores instead? @jedwardsConsidering your system here: Systems & Equipment | High Performance Computing
The Mellanox EDR (100Gbps) switch is fine. You currently have Intel skylake nodes on the system,
increasing the number of skylake nodes is an option, Following the intel roadmap to a newer technology may also be an option. Most recently AMD nodes are outperforming Intel in price/performance however it is probably not possible for you to consider adding AMD to your cluster. For cesm2 ne120 core (0.25 degrees) we are getting up to nearly 10 ypd on the TACC frontera system (Cascade lake) using up to 45K cores.
Thanks for that information. I guess I could run it at 1 ypd as my resources do not allow for such high performance. And I could also run at 1 deg resolution, which I think is standard these days.10ypd for ne120 is an impressive performance number that can be achieved on few current HPC systems. I did mean 45,000