guangxia@hawaii_edu
New Member
Dear all,
I have worked on b30.009, b30.026a.ES01, and b30.026b.
b30.009 is control run, I think it is a background run,
b30.026a.ES01 is CCSM 1%/year CO2 increase experiment, to 2x, I interpret it as the 1% CO2 increase per year until the doubling of CO2 reached.
b30.026b says CCSM3.0 4x CO2 run, T85_gx1v3, I don't know how to interpret it, quadraped CO2 run?
Could you please give me a hint?
Why b30.026b only have data with time period 549-698? why cannot correspond to the control run time 1-599. Whether 549 in both runs suggest same time?
and b30.026a.ES01 only have data with time period 479-630.
Thank you very much for your time.
Jax
I have worked on b30.009, b30.026a.ES01, and b30.026b.
b30.009 is control run, I think it is a background run,
b30.026a.ES01 is CCSM 1%/year CO2 increase experiment, to 2x, I interpret it as the 1% CO2 increase per year until the doubling of CO2 reached.
b30.026b says CCSM3.0 4x CO2 run, T85_gx1v3, I don't know how to interpret it, quadraped CO2 run?
Could you please give me a hint?
Why b30.026b only have data with time period 549-698? why cannot correspond to the control run time 1-599. Whether 549 in both runs suggest same time?
and b30.026a.ES01 only have data with time period 479-630.
Thank you very much for your time.
Jax