Hi,
I found I met some issues with simulation time limitation and thus I want to revise the relevant parameters i.e., 'JOB_WALLCLOCK_TIME' and 'JOB_QUEUE'. I think I would like to increase the wallclock time length (JOB_WALLCLOCK_TIME), for example, 12:00:00. In this context, I should also change JOB_QUEUE from 'share' to 'regular'.
However, I noticed that in the 'env_workflow.xml', there seem to be two 'JOB_QUEUE' and 'JOB_WALLCLOCK_TIME'. I list current relevant parameters below:
<group id="case.run">
<entry id="JOB_WALLCLOCK_TIME" value="06:00:00">
<entry id="JOB_QUEUE" value="share">
<group id="case.st_archive">
<entry id="JOB_WALLCLOCK_TIME" value="00:20:00">
<entry id="JOB_QUEUE" value="share">
Thus, I am not sure how I should change these parameters. Could anyone give me some insights? Many thanks in advance!
I found I met some issues with simulation time limitation and thus I want to revise the relevant parameters i.e., 'JOB_WALLCLOCK_TIME' and 'JOB_QUEUE'. I think I would like to increase the wallclock time length (JOB_WALLCLOCK_TIME), for example, 12:00:00. In this context, I should also change JOB_QUEUE from 'share' to 'regular'.
However, I noticed that in the 'env_workflow.xml', there seem to be two 'JOB_QUEUE' and 'JOB_WALLCLOCK_TIME'. I list current relevant parameters below:
<group id="case.run">
<entry id="JOB_WALLCLOCK_TIME" value="06:00:00">
<entry id="JOB_QUEUE" value="share">
<group id="case.st_archive">
<entry id="JOB_WALLCLOCK_TIME" value="00:20:00">
<entry id="JOB_QUEUE" value="share">
Thus, I am not sure how I should change these parameters. Could anyone give me some insights? Many thanks in advance!