Scheduled Downtime
On Tuesday 24 October 2023 @ 5pm MT the forums will be in read only mode in preparation for the downtime. On Wednesday 25 October 2023 @ 5am MT, this website will be down for maintenance and expected to return online later in the morning.
Normal Operations
The forums are back online with normal operations. If you notice any issues or errors related to the forums, please reach out to help@ucar.edu

Transient historical to transient future forcing

Hello all, I'm looking to carry out a simulation that spans the historical period (1850-2000) with the B_1850-2000_CN component set and then move into an RCP6 scenario simulation with the compset B_RCP6.0_CN. Is the best way to do this through a hybrid run with the REFCASE as the end of the historical run for the future simulation? I've also noticed that most RCP cases that have been done start in 2005 - is this by extending the B_1850-2000_CN simulation to 2005? Any insight is much appreciated!Meg Fowler  
 
Top