I am running the compset "2000_DATM%CRUv7_CLM50%BGC_SICE_SOCN_SROF_SGLC_SWAV" at a single point. The forcing I am using
is the CRU-JRA v2.2 (1901-2020), but I processed the data into the format compatible with those used for cesm. Here is the list of command and setting:
./create_newcase --case hvd --compset 2000_DATM%CRUv7_CLM50%BGC_SICE_SOCN_SROF_SGLC_SWAV --res hcru_hcru --machine svante --compiler intel --run-unsupported
RUN_STARTDATE: 1901-01-01
DATM_CLMNCEP_YR_ALIGN: 1901
DATM_CLMNCEP_YR_START: 1901
DATM_CLMNCEP_YR_END: 1920
I am able to generate the output for 4 years and 10 months, then I got this ERROR: (shr_stream_verifyTCoord) ERROR: calendar dates must be increasing.
The atm.log.* file indicates that the error comes from solar radiation with these weird date(n) and date(n+1)
(shr_dmodel_readstrm) close : /net/fs05/d1/cesm2/inputdata/atm/datm7/atm_forcing.datm7.crujra/Solar6Hrly/clmforc.cruncep.V7.c2016.0.5d.Solr.1905-11.nc
(shr_dmodel_readstrm) open : /net/fs05/d1/cesm2/inputdata/atm/datm7/atm_forcing.datm7.crujra/Solar6Hrly/clmforc.cruncep.V7.c2016.0.5d.Solr.1905-12.nc
(shr_dmodel_readstrm) file ub: /net/fs05/d1/cesm2/inputdata/atm/datm7/atm_forcing.datm7.crujra/Solar6Hrly/clmforc.cruncep.V7.c2016.0.5d.Solr.1905-12.nc 1
(datm_comp_run) atm: model date 19051130 66600s
(datm_comp_run) atm: model date 19051130 68400s
(datm_comp_run) atm: model date 19051130 70200s
(datm_comp_run) atm: model date 19051130 72000s
(datm_comp_run) atm: model date 19051130 73800s
(datm_comp_run) atm: model date 19051130 75600s
(shr_stream_verifyTCoord) ERROR: calendar dates must be increasing
(shr_stream_verifyTCoord) date(n), date(n+1) = 19051213 19051201
I processed the data in a consistent way. I tested with cycling with another 20 years of forcing data, eg. 1911-1930, the 20-year run can be completed successfully. I also examined the solar radiation data for 1905-12, but the data looks fine to me.
Is there any way to diagnose which part went wrong?
Thanks,
Xiang
is the CRU-JRA v2.2 (1901-2020), but I processed the data into the format compatible with those used for cesm. Here is the list of command and setting:
./create_newcase --case hvd --compset 2000_DATM%CRUv7_CLM50%BGC_SICE_SOCN_SROF_SGLC_SWAV --res hcru_hcru --machine svante --compiler intel --run-unsupported
RUN_STARTDATE: 1901-01-01
DATM_CLMNCEP_YR_ALIGN: 1901
DATM_CLMNCEP_YR_START: 1901
DATM_CLMNCEP_YR_END: 1920
I am able to generate the output for 4 years and 10 months, then I got this ERROR: (shr_stream_verifyTCoord) ERROR: calendar dates must be increasing.
The atm.log.* file indicates that the error comes from solar radiation with these weird date(n) and date(n+1)
(shr_dmodel_readstrm) close : /net/fs05/d1/cesm2/inputdata/atm/datm7/atm_forcing.datm7.crujra/Solar6Hrly/clmforc.cruncep.V7.c2016.0.5d.Solr.1905-11.nc
(shr_dmodel_readstrm) open : /net/fs05/d1/cesm2/inputdata/atm/datm7/atm_forcing.datm7.crujra/Solar6Hrly/clmforc.cruncep.V7.c2016.0.5d.Solr.1905-12.nc
(shr_dmodel_readstrm) file ub: /net/fs05/d1/cesm2/inputdata/atm/datm7/atm_forcing.datm7.crujra/Solar6Hrly/clmforc.cruncep.V7.c2016.0.5d.Solr.1905-12.nc 1
(datm_comp_run) atm: model date 19051130 66600s
(datm_comp_run) atm: model date 19051130 68400s
(datm_comp_run) atm: model date 19051130 70200s
(datm_comp_run) atm: model date 19051130 72000s
(datm_comp_run) atm: model date 19051130 73800s
(datm_comp_run) atm: model date 19051130 75600s
(shr_stream_verifyTCoord) ERROR: calendar dates must be increasing
(shr_stream_verifyTCoord) date(n), date(n+1) = 19051213 19051201
I processed the data in a consistent way. I tested with cycling with another 20 years of forcing data, eg. 1911-1930, the 20-year run can be completed successfully. I also examined the solar radiation data for 1905-12, but the data looks fine to me.
Is there any way to diagnose which part went wrong?
Thanks,
Xiang