I am a user of CESM2.1.3, I plan to study the land NPP from 1979 to 2015. But I'm confused about the spin up process of CESM2.1.3. The Fig.4(attach) in the article named The Community Earth System Model Version 2 (CESM2) is not easy to understand. If I want to run CESM from 1979 to 2015 at B1850, are the following steps correct?
1.spin up the model based on 0134-01-01 data run from 0001-01-01 to 0200-01-01.
2.directly run the model from 1979 to 2015 based on the r file of 0200-01-01.
1.spin up the model based on 0134-01-01 data run from 0001-01-01 to 0200-01-01.
2.directly run the model from 1979 to 2015 based on the r file of 0200-01-01.