Hi all,
I am trying to run both land-only and fully-coupled simulations with transient forcing. Therefore, I plan to choose the compset IHistClm50Sp for land-only simulations and the compset BHIST for fully-coupled simulations, respectively. I want to run simulations starting from 1870. However, the default start year is 1850 in HIST compset.
In this case, I am not sure how to change the start year. Based on the existed forums, my current understanding is as follows:
1. IHistClm50Sp
In land-only simulations, I need to change RUN_STARTDATE, DATM_CPLHIST_YR_START, DATM_CPLHIST_YR_END, DATM_CPLHIST_ALIGN.
RUN_STARTDATE = 1870
DATM_CPLHIST_ALIGN = 1
DATM_CPLHIST_YR_START = 1870
DATM_CPLHIST_YR_END = 2014 (if I hope the simulations end in 2014)
Is that all I need to set?
2. BHIST
I am more confused about the settings in fully-coupled simulations. Should I change RUN_STARTDATE, RUN_REFCASE, and RUN_REFDATE?
When the compset is set as BHIST and RUN_STARTDATE is set as 1870, I found the default RUN_REFCASE = b.e21.B1850.f09_g17.CMIP6-piControl.001_v3hist, and the default RUN_REFDATE = 0501-01-01. Apparently, the forcing data with the default RUN_REFCASE and RUN_REFDATE would not be starting from 1870.
Therefore, should I go to '/glade/campaign/collections/cmip/CMIP6/restart' to find another case which include the year 1870 as the RUN_REFCASE? Any other parameters I need to change?
Thanks for your attention to this matter.
Best,
Song
I am trying to run both land-only and fully-coupled simulations with transient forcing. Therefore, I plan to choose the compset IHistClm50Sp for land-only simulations and the compset BHIST for fully-coupled simulations, respectively. I want to run simulations starting from 1870. However, the default start year is 1850 in HIST compset.
In this case, I am not sure how to change the start year. Based on the existed forums, my current understanding is as follows:
1. IHistClm50Sp
In land-only simulations, I need to change RUN_STARTDATE, DATM_CPLHIST_YR_START, DATM_CPLHIST_YR_END, DATM_CPLHIST_ALIGN.
RUN_STARTDATE = 1870
DATM_CPLHIST_ALIGN = 1
DATM_CPLHIST_YR_START = 1870
DATM_CPLHIST_YR_END = 2014 (if I hope the simulations end in 2014)
Is that all I need to set?
2. BHIST
I am more confused about the settings in fully-coupled simulations. Should I change RUN_STARTDATE, RUN_REFCASE, and RUN_REFDATE?
When the compset is set as BHIST and RUN_STARTDATE is set as 1870, I found the default RUN_REFCASE = b.e21.B1850.f09_g17.CMIP6-piControl.001_v3hist, and the default RUN_REFDATE = 0501-01-01. Apparently, the forcing data with the default RUN_REFCASE and RUN_REFDATE would not be starting from 1870.
Therefore, should I go to '/glade/campaign/collections/cmip/CMIP6/restart' to find another case which include the year 1870 as the RUN_REFCASE? Any other parameters I need to change?
Thanks for your attention to this matter.
Best,
Song