Hello,
My current CESM version is release-cesm2.1.5-0-g7a6c5b0.
I created a case with f19_g17 grid (2deg grid), which is an economic option since I need to run the model for very long time.
Now I want to run the model with reference case 'b.e21.BHIST.f09_g17.CMIP6-historical.010_v2', which is in f09_g17 grid (1deg grid).
My case and the reference case are using different grids, so the model raises errors (see attachments). Is there any configuration in CESM that allows interpolation of grids from reference cases to the case I run?
Below are edits by ./xmlchange:
<entry id="RUN_TYPE" value="hybrid">
<entry id="RUN_REFDIR" value="cesm2_init">
<entry id="RUN_REFCASE" value="b.e21.BHIST.f09_g17.CMIP6-historical.010_v2">
<entry id="RUN_REFDATE" value="2015-01-01">
<entry id="GET_REFCASE" value="TRUE">
<entry id="RUN_STARTDATE" value="2015-01-01">
Thanks
My current CESM version is release-cesm2.1.5-0-g7a6c5b0.
I created a case with f19_g17 grid (2deg grid), which is an economic option since I need to run the model for very long time.
Now I want to run the model with reference case 'b.e21.BHIST.f09_g17.CMIP6-historical.010_v2', which is in f09_g17 grid (1deg grid).
My case and the reference case are using different grids, so the model raises errors (see attachments). Is there any configuration in CESM that allows interpolation of grids from reference cases to the case I run?
Below are edits by ./xmlchange:
<entry id="RUN_TYPE" value="hybrid">
<entry id="RUN_REFDIR" value="cesm2_init">
<entry id="RUN_REFCASE" value="b.e21.BHIST.f09_g17.CMIP6-historical.010_v2">
<entry id="RUN_REFDATE" value="2015-01-01">
<entry id="GET_REFCASE" value="TRUE">
<entry id="RUN_STARTDATE" value="2015-01-01">
Thanks