Dear all
I want to use my own atmforcing data to run a regional case in CLM5.0,and I have processed it the standard format as GSWP3, i.e., monthly precip, solar and tphwl, meanwhile made a domain file for the atm foring) to replace, but I have met some problems:
my forcing data has 3 h temporal resolution and spatial resolution is 0.1x0.1.
error
(shr_dmodel_readstrm) file ub: /home/aircas/cesm/inputdata/atm/datm7/solar/clmforc.0.1x0.1.solar-2010-03.nc 25
(shr_stream_verifyTCoord) ERROR: calendar dates must be increasing
(shr_stream_verifyTCoord) date(n), date(n+1) = 20100303 20100301
ERROR: (shr_stream_verifyTCoord) ERROR: calendar dates must be increasing
I do not know why it happened. I run the case during Jan. or Feb. ,there is no error happened. I try the different year. The same error happened during Mar.
But I create the atmforcing data by the same way .
Can anyone help me ?
I want to use my own atmforcing data to run a regional case in CLM5.0,and I have processed it the standard format as GSWP3, i.e., monthly precip, solar and tphwl, meanwhile made a domain file for the atm foring) to replace, but I have met some problems:
my forcing data has 3 h temporal resolution and spatial resolution is 0.1x0.1.
error
(shr_dmodel_readstrm) file ub: /home/aircas/cesm/inputdata/atm/datm7/solar/clmforc.0.1x0.1.solar-2010-03.nc 25
(shr_stream_verifyTCoord) ERROR: calendar dates must be increasing
(shr_stream_verifyTCoord) date(n), date(n+1) = 20100303 20100301
ERROR: (shr_stream_verifyTCoord) ERROR: calendar dates must be increasing
I do not know why it happened. I run the case during Jan. or Feb. ,there is no error happened. I try the different year. The same error happened during Mar.
But I create the atmforcing data by the same way .
Can anyone help me ?