swieneke@meteo_uni-koeln_de
New Member
Hello,
I converted meteorological data from csv to netcdf and tried to force my created surface data with this atmospheric data. Unfortunately the simulation stops with the error:
	
	
	
		
My netcdf looks like this:
	
	
	
		
I guess my NetCDF file is incorrect, anyone an idea where the error occur?
Another question:
My CASE is configured to start on 2012-05-01 and end after one month. Is it correct that even if i want to simulate one month i have to provide data for the whole year?
Cheers
Sebastian
				
			I converted meteorological data from csv to netcdf and tried to force my created surface data with this atmospheric data. Unfortunately the simulation stops with the error:
		HTML:
	
	(datm_comp_init)  atm_in   = datm_atm_in
(datm_comp_init)  decomp   = 1d
(datm_comp_init)  iradsw   =        1
(datm_comp_init)  factorFn = unused
(datm_comp_init)  restfilm = undefined
(datm_comp_init)  restfils = undefined
(datm_comp_init)  presaero =  T
(shr_strdata_readnml) reading input namelist file: datm_atm_in
(shr_stream_init) Reading file clm1PT.1x1_rollesbroich.stream.txt
(shr_sys_abort) ERROR: (shr_stream_getCalendar)  ERROR: nf90_open file /home/swieneke/inputdata/atm/datm7/CLM1PT_data/1x1_rollesbroich/2012-01.nc
(shr_sys_abort) WARNING: calling shr_mpi_abort() and stoppingMy netcdf looks like this:
		HTML:
	
	dimensions:
	time = UNLIMITED ; // (4464 currently)
	lat = 1 ;
	lon = 1 ;
variables:
	int time(time) ;
		time:units = "minutes since 2012-01-01 00:00:00.0" ;
		time:calendar = "gregorian" ;
	float latitude(lat) ;
	float longitude(lon) ;
	float ZBOT(time) ;
		ZBOT:units = "m" ;
	float TBOT(time) ;
		TBOT:units = "K" ;
	float WIND(time) ;
		WIND:units = "m/s" ;
	float FSDS(time) ;
		FSDS:units = "W/m^2" ;
	float FLDS(time) ;
		FLDS:units = "W/m^2" ;
	float PSRF(time) ;
		PSRF:units = "Pa" ;
	float PRECTmms(time) ;
		PRECTmms:units = "mm/s" ;
	float RH(time) ;
		RH:units = "%" ;
}I guess my NetCDF file is incorrect, anyone an idea where the error occur?
Another question:
My CASE is configured to start on 2012-05-01 and end after one month. Is it correct that even if i want to simulate one month i have to provide data for the whole year?
Cheers
Sebastian
